DOMINATOR INSTALLATION AND OPERATION INSTRUCTIONSPage 26
6. If the second ignition attempt is unsuccessful the
gas valves will lockout, but the blower, pump and
power venter will remain on. To reset the boiler/water
heater, take one of the following steps:
Adjust the high limit down below the point at which
the blower shuts down, then reset the limit to its
normal setting.
Remove power from the boiler/water heater, wait
30 seconds and re-establish power to the unit.
7. On CSD-1 applications the blower and power venter
will shut down and the boiler/water heater will lock
out. The unit must be manually reset.
Main Burner:
1. Once the pilot is proved the MV terminal on (FSM)
is energized sending 24V ac to the main gas valve.
2. The main gas valve opens via action of K1.
3. The main burner indicator light illuminates. The PV
terminal remains energized and the pilot indicator
remains on.
Normal Operation
• Staging will be controlled from the staging controller.
• The front control panel separately monitors limit, gas
pressure, water fl ow and airfl ow.
• If staging changes during operation, the blower,
pressure switches and gas valves will be switched or
turned off as required.
• Stage 1 will operate fi rst and last.
NOTE: For a change from stage 1 to 2, a 10 second
DOM time delay is provided in the pressure switch
switching circuit (TDR2). The time delay provides a
hold state that allows the blower to reach full speed
and close the high fi re pressure switch before it is
energized to confi rm proper air fl ow.
Demand Satisfi ed:
1. Stage switch 1 opens, TDR1 de-energizes.
2. Power is removed from ignition module, blower and
power venter.
3. All indicator lights turn off except for the power
indicator light.
4. Staging controller initiates a pump purge for 20 or
more seconds, depending on the inlet/outlet
temperatures and ΔT setting in the controller. The
pump then shuts off.
Staging Control Alarms:
1. Staging control alarms are visible on the controller's
LCD screen. See the staging control documentation
for details.
2. A powered alarm contact (2A max @ 24 VAC) is
available to provide an audio or visual indication of
faults related only to the staging control's operation.
This contact is wired to the junction box for optional
remote indication. Refer to the 2 stage connection
diagram for tie-ins.
High Limit, Low Water Flow, Low Gas Pressure,
High Gas Pressure, Power Venter Interlock Faults
1. All gas valves, the blower and power venter will be
off if either alarm is tripped.
2. The manual reset high limit can be reset through a
knockout accessible in the left side jacket panel.
3. Condition indicators are visible on the control panel.
Low Air (Blocked Flue/Air Inlet)
• One of two pressure switches will monitor blower
airfl ow.
Air monitoring will begin at prepurge. If a low air
condition is present, power will not be supplied to the
ignition module. The blower will remain on and the low
air indicator will remain on for as long as stage 1
remains energized.
• A low air indicator is visible on the control panel.
OPERATION SEQUENCE, 4 STAGE
D1050 THROUGH D2100
Note: Refer to the included connection and wiring
diagrams for further control system information.
POWER ON:
Demand for Heat:
1. BTC staging control starts pump and begins 50
second delay before energizing Stage 1.
2. Stage switch 1 closes.
3. System checks primary limit and other interlocks.
Will not start if either switch is open.
Prepurge:
1. TDR1 energizes starting a 40 second prepurge
cycle.
2. K4 energizes the low speed side of both blowers. If
the side-wall vent option is used the power venter
is energized, closing the power venter interlock. The
power vent indicator light illuminates.
3. The low air indicator lights will remain lit until the
blowers comes up to speed. The indicator lights will
turn off and prepurge indicator light will illuminate
when the pressure switches make.
4. At the end of the prepurge cycle TDR1 times out
and the TDR1 N.O. contacts close sending 24V ac
to the ignition control.
5. The prepurge indicator light shuts off.
6. K2 will switch the pilot valve, left main valve and
blower to high fi re or low fi re, depending on the
staging.
7. K3 will switch the right main valve and blower to high
re or low fi re, depending on the staging.